S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 6.45 | 1000 | 6450 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 26.25 | 110.6 | 2903.25 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 87.94 | 3474.1 | 305512.354 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 112.66 | 179.1 | 20177.406 |
6 | TRANSPORTATION OF MATERIAL | 79 | 1000 | 79000 |
7 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 437.5 | 11.2 | 4900 |
8 | Collection of hard moorum including stacking at quarry. | 65.63 | 142.5 | 9352.275 |