State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: KONDAWAD
Work Code: 1725006031/WC/22012034292971 (पेयजल कूप निर्माण नाले के पास कोंडावद )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2016 Work start date : 19/3/2016
Present status : Non-existent Proposed Status : Water Absorption Trench
Tech Sanction Details
Technical Sanction No. : 1738/kon Sanction Date : 18/3/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
572000 381000 0 0 0 0 0 381000 0 953000
Financial Sanction Details
Financial\Administrative Sanction No: 04/kon Financial\Administrative Sanction Date 19/3/2016
Fin. Sanc. Amt. (in Rs) NREGA:953000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
953000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises111
2Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)2866870.257337.4
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)20.43870.2978953.916
4False work for R.C.C. and P.C.C. work in plinth and foundation316.51167.553015.425
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars997.466.466227.36
6Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.997.4600.88599317.712
7Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)226.08202.9545882.936
8work charge15200052000
Total Activity 953000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod27549.7513681.25
212 mm -  M.S. rod102649.7551043.5
320 mm HG Chips25.55125031937.5
440 mm size HG metal000
5blasting814125101750
6Board120002000
7BOLDER DHULAI BAHADA SAHIT110255.528105
8Cement18830958092
9Centring & Shuttering322104.533649
10Conteng 11697515600
11deasil pump6045027000
12Mate111
13PhotoCopy & Stationary40041600
14Photograph1540600
15Sand (Filling)12.77124715924.19
16Transpotation Charges000
17Water Can000
Total Material 381000