State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: GOARKALAN
Work Code: 1702001025/RC/22012034230719 (Gravel Road Janjaripura-goarkala road to Jaysingh )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 25/4/2014 Work start date : 29/9/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 7968 Sanction Date : 1/9/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
254500 169700 0 0 0 0 0 170000 0 424200
Financial Sanction Details
Financial\Administrative Sanction No: 03/7968 Financial\Administrative Sanction Date 2/9/2014
Fin. Sanc. Amt. (in Rs) NREGA:424200 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
425000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.27004.111070
3Chain and compass survey.-Canals/Roads0.3584175.2
4Fly levelling for fixing temporary bench marks.-Above 15 m interval0.3438131.4
5Levelling - Headwork.-Below 5 m interval0.31460438
6Levelling - Headwork.-Above 15 m interval0.3467140.1
7Stacking and boxing.-Moorum or sand180152700
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1157000157000
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.18080.514490
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN18059.710746
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making71820.714862.6
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor92922.120530.9
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work164781.2133736.4
14Collection of hard moorum including stacking at quarry.180130.823544
15contingency11700017000
16Labour difference in case of old SoR11520015200
Total Activity 425000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work71820.714862.6
2Compaction of GSB18059.710746
3Compaction of Selected soil92922.120530.9
4contigency130003000
5Kilometre Stone (200 M)43341336
6Transportation of GSB12000020000
7Transportation Of Selected Soi19950099500
Total Material 170000