Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:46:58 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/RC/22012034200438 (पीसीसी सहनाली निर्माण Ts no 1522 रामनिवास गुप्‍ता )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 24/1/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 1522/09 Sanction Date : 27/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
78000 51000 0 0 371000 0 0 422000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 45/09 Financial\Administrative Sanction Date 30/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:129000 Panchparmeshwar
371000
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)61.53234.3198909.45
2False work for R.C.C. and P.C.C. work in plinth and foundation83.2126.210499.84
3Providing and fixing fiber hard board sheet, lining with but jointing and nails (frame work and cover fillets to be measured and paid separately) .-Medium hard boards 6 mm thick61.52343.8144143.7
4Stacking without boxing.-Masonry stones, pitching stones or boulders92.25170.2215702.795
5Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1104893.25104893.25
6Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil92.2581.27490.7
7Providing and fixing laboratory sink with C.I. or M.S. brackets painted white including cutting holes in walls and making good the same but excluding fitting.-Vitreous China 450 mm x 300 mm x 150 mm size990.6815.4
8SIGN BOARD115001500
9contingency11600016000
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
120 mm -  M.S. rod52.79145076545.5
240 M.M. METAL55.351337.9474054.979
3CEMENT(BEGS)665265176225
4contangency and work charges000
5Display board115001500
6P V C PIPE945.3407.7
7sand cum54.11134072507.4
8Transportaion of muram (trip)92.25223.5620623.41
9सेन्‍टीग000
Total Material 422000