State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: TINDUWA
Work Code: 1711003045/RC/22012034218913 (खेत सडक एवं पुलिया निर्माण कार्य तिंदुआ से पथरिया )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 24/5/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1570/tin Sanction Date : 26/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
902000 591000 0 0 0 0 0 591000 0 1493000
Financial Sanction Details
Financial\Administrative Sanction No: 01/tin Financial\Administrative Sanction Date 28/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1493000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1493000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.5722.54.425179
2Contingency1100000100000
3Work charge15552255522
4Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil5463.3638.06207935.4816
5Filling foundation and around masonry work with moorum I/c ramming layers and watering.18158.32849.4
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)183474.162533.8
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)182291.441245.2
8Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used2.42169.4409.948
9Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)5.253375.417720.85
10Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:4 (1cement, 4sand)13.52216.429921.4
11Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars443.454.424120.96
12TRANSPORTATION OF MATERIAL16253362533
13Chain and compass survey.-Canals/Roads1636636
14Fly levelling for fixing temporary bench marks.-Above 15 m interval1477477
15Levelling - Headwork.-Below 5 m interval115901590
16Levelling - Headwork.-Above 15 m interval1954954
17Stacking without boxing.-Masonry stones, pitching stones or boulders2889.2311.533226.145
18Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.600124.274520
19Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 11277812778
20Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.600169.6101760
21Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.1681.7344.775173.331
22Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7787.525.720238.75
23Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN42166.628038.6
24Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia14315.84421.2
25Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making762.4637.628668.496
26Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1676.3339.365879.769
27Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work787.588.469615
28Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti44.84101.64555.744
29Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil43341336
30Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil46872748
31Collection of soft moorum including stacking at quarry.788122.896766.4
32Collection of hard moorum including stacking at quarry.1681.73142.5239646.525
Total Activity 1493000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal11.92120014304
240 mm Metal16.5680013248
3BGSY Information Board in Ceme159335933
4Cement30030090000
5Compaction11000010000
6contigency150005000
7earth worlk compaction1650.9639.364882.728
8Iron rod1003.2249.849960.356
9Kilometre Stone (200 M)43341336
10Kilometre Stone (ordinary)46872748
11km stone000
12Mixture Machine000
13PhotoCopy & Stationary120002000
14pipe000
15roller42066.627972
16Transportanion of hard Muram1029.36169.6174579.456
17Transportation of embankment s000
18Transportation Of Material000
19Transportation of Water262.7248.6412778.7008
20पत्‍थर120.2333.0640033.812
21रेत54.285140075999
Total Material 591000