Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:31:19 AM 
Back  
State: MADHYA PRADESH District: REWA Block: MAUGANJ Panchayat: HARRAHA
Work Code: 1713006080/WC/22012034953998 (अमृत सरोबर हर्रहा 1)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 4/4/2022 Work start date : 19/4/2022
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 98/1 Sanction Date : 8/4/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
1237000 922000 0 0 100000 0 0 1022000 0 2259000
Financial Sanction Details
Financial\Administrative Sanction No: 2235/6 Financial\Administrative Sanction Date 8/4/2022
Fin. Sanc. Amt. (in Rs) NREGA:2159000 15th Finance Commission
100000
Scheme 2
0
Scheme 3
0
Total
2259000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Survey & Investigation13000030000
2Site clearance, cutting grass, raking into heaps and removing off the premises63426.6542174.3
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil491.4313968308.77
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum4459181.56809576.04
5Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil29.52158.934691.6136
6Dag-beling-Single spade stroke minimum 75mm deep6000.38228
7Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil759.917.3713199.463
8Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)49.293829.11188736.8319
9Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)8.223175.7826104.9116
10False work for R.C.C. and P.C.C. work in plinth and foundation11517219780
1122cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014228.87370.2584739.1175
12Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 54862.2112124.06
13Transportation rates for Masonry stone.242.2738.159242.6005
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.5177117.75609591.75
15Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor517721.79112806.83
16FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.495.71163.5681078.3276
17FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc.368.5158.9458569.39
18FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size44211852156
19FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 20 mm nominal size220.5158.9435046.27
Total Activity 2259000
S.NoMaterialQuantityUnit PriceTotal
1Boulder Transportation132.5242.2832102.1
2Convergence Amount1100000100000
3Lead of Casing Soil 0.50 Km563575.54425667.9
4Metal c50.97155079003.5
5pitching stone354174.6261815.48
6Rolling Compaction582019.6114072
7Sand25.48195049686
8Shuttering11513815870
9singboard135003500
10t.p.g. boulder puddle earth by250561140250
Total Material 1022000