State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: NAYAPUR
Work Code: 1743002034/RC/22012034207269 (nayapura se oova ke or 500m se aage ke or 500m gra)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 22/2/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 407 Sanction Date : 7/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
495000 350000 0 0 0 0 0 350000 0 845000
Financial Sanction Details
Financial\Administrative Sanction No: 1907 Financial\Administrative Sanction Date 13/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:845000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
845000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises50001.68000
2Dag-beling-Single spade stroke minimum 75mm deep15000.2300
3Stacking without boxing.-Puddle earth, moorum, sand or kankar1903.510.519986.75
4Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 3037.53.7511390.625
5Transportation of metal 131.131903.5249605.955
6Transportation of metal 7.51181.188858.85
7Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.71903.54178043.5
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.7.54242.731820.25
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making252016.441328
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor517.518.19366.75
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work113481.292080.8
12Collection of soft moorum including stacking at quarry.270112.830456
13Collection of hard moorum including stacking at quarry.247.5130.832373
14contingency1231389.52231389.52
Total Activity 845000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work252016.441328
2contangency and work charges14911449114
3pipe7.5406730502.5
4sub grede compection517.518.19366.75
5Transportanion of hard Muram1656104.85173631.6
6Transportanion of Soft Muram247.5104.8525950.375
7Transportation charges7.51181.188858.85
8watering29993.7511246.25
Total Material 350000