State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PUR
Work Code: 1702001029/RC/22012034225053 (Graval road Dr. Aashish ki shop to Ramraten t.w.)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/5/2014 Work start date : 16/7/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 7685 Sanction Date : 21/6/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
549000 228500 0 0 0 0 0 229000 0 777500
Financial Sanction Details
Financial\Administrative Sanction No: 25/7685 Financial\Administrative Sanction Date 4/7/2014
Fin. Sanc. Amt. (in Rs) NREGA:777500 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
778000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.63004.125830
3Chain and compass survey.-Canals/Roads0.7584408.8
4Fly levelling for fixing temporary bench marks.-Above 15 m interval0.7438306.6
5Levelling - Headwork.-Below 5 m interval0.714601022
6Levelling - Headwork.-Above 15 m interval0.7467326.9
7Stacking and boxing.-Moorum or sand420156300
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1208500208500
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN42059.725074
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1676.32520.734699.9275
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor2090.922.146208.89
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work3841.8881.2311960.656
13Collection of hard moorum including stacking at quarry.420130.854936
14contingency13250032500
15Labour difference in case of old SoR12478024780
Total Activity 778000
S.NoMaterialQuantityUnit PriceTotal
1BGSY SIGN BOARD130003000
2Compaction of Earth Work1676.3320.734700.031
3Compaction of GSB42059.725074
4Compaction of Selected soil2090.922.146208.89
5contangency and work charges12100021000
6Kilometre Stone (200 M)43341336
7Kilometre Stone (ordinary)46872748
8Transportation charges19450094500
Total Material 229000