S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 0 | 0 | 0 |
2 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 465.6 | 78.39 | 36498.384 |
3 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 960 | 33.2 | 31872 |
4 | Lossening of hard soil by ploughing the existing gound | 1535 | 2.7 | 4144.5 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 1535 | 50 | 76750 |
6 | contingency | 1 | 36829.12 | 36829.12 |