S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 1350 | 0.2 | 270 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 582.19 | 66.6 | 38773.854 |
3 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2193.75 | 12 | 26325 |
4 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 582.19 | 149.13 | 86821.9947 |
5 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 253.13 | 64.2 | 16250.946 |
6 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 22.5 | 3080 | 69300 |
7 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 1940.63 | 18.8 | 36483.844 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1940.63 | 67.8 | 131574.714 |
9 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil. | 3600 | 5.8 | 20880 |
10 | Collection of hard moorum including stacking at quarry. | 253.13 | 109.3 | 27667.109 |
11 | SIGN BOARD | 1 | 1000 | 1000 |
12 | contingency | 10 | 2055 | 20550 |
13 | Labour difference in case of old SoR | 974.96 | 24 | 23399.04 |