S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 3850 | 7.60931688311688 | 29295.87 |
2 | (III) Lead upto 200 meters | 970.2 | 126.363378684807 | 122597.75 |
3 | Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m. | 242.55 | 272.567429396001 | 66111.23 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 30.03 | 4408.24575424575 | 132379.62 |
5 | (c) Masonry stones, pitching stones or boulders | 970.2 | 50.57032570604 | 49063.33 |
6 | (XXIX) 50 Km. Lead | 25.526 | 669.78061584267 | 17096.82 |
7 | (VI) 3.0 Km. Lead | 970.2 | 151.317553081839 | 146808.29 |
8 | (XXVII) 40 Km. Lead | 12.913 | 515.650120034074 | 6658.59 |
9 | (IX) 4.5 Km. Lead | 6.607 | 160.617526865446 | 1061.2 |
10 | Labour only for boulder soling hand packed excluding consolidation. | 970.2 | 215.827726242012 | 209396.06 |
11 | (b) Dense or hard soil | 277.2 | 169.853102453102 | 47083.28 |
12 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 970.2 | 187.297495361781 | 181716.03 |