S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 3307.4 | 17.5 | 57879.5 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 2202.3 | 56 | 123328.8 |
3 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 1858.7 | 280 | 520436 |
4 | Providing wood work in trusses, purlins, rafters, posts, post plates, wall plates and the like brought framed, hoisted and fixed in position.-Bija wood | 167770 | 1 | 167770 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 127.6 | 560 | 71456 |
6 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 360.3 | 50.4 | 18159.12 |
7 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 1 | 1 | 1 |
8 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil. | 52.7 | 541.0247 | 28512.00169 |
9 | Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Other than black trap Basalt or granite | 584 | 280 | 163520 |
10 | Lossening of hard soil by ploughing the existing gound | 43400 | 1 | 43400 |