S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 1190 | 7.5 | 8925 |
2 | Transportation of metal | 595 | 102.69 | 61100.55 |
3 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 1190 | 23 | 27370 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 1190 | 81.2 | 96628 |
5 | SIGN BOARD | 1 | 1500 | 1500 |
6 | work charge | 1 | 1000 | 1000 |
7 | contingency | 1 | 6027 | 6027 |
8 | Labour difference in case of old SoR | 30 | 146 | 4380 |