State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: PIPAROKHAR
Work Code: 1712004017/AV/22012034391808 (PANCHAYAT BHAWAN NIRMAN KARYA PIPROKHAR)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/4/2018 Work start date : 4/10/2018
Present status : NEW Proposed Status : Constr of Bharat Nirman Seva Kendra
Tech Sanction Details
Technical Sanction No. : 3*2018-19 Sanction Date : 9/4/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost 14th Fianance Commission scheme2 scheme3 Total
347000 232200 0 0 868800 0 0 1101000 0 1448000
Financial Sanction Details
Financial\Administrative Sanction No: 8* 2018-19 Financial\Administrative Sanction Date 28/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:579200 14th Fianance Commission
868800
Scheme 2
0
Scheme 3
0
Total
1448000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil22916738243
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m4164.82656.8
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.247.917.924442.368
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2562.817.26644249.3048
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)491653.429262656.964
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)2984.512.24336539.2335
7Add for masonry in supper structure above plinth level up to floor two level220.339.1868632.6758
8Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:413.86427.25920.992
9Providing and fixing flush door shutters, solid core construction, Non-decorative type (paintable) with skins of particle boards unveneered and block board core, with frame of first class hard wood with particle board veneered particle board face panels i-40 mm thick (double leaf)1630.127.344501.73
10Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height71.7502.5836034.986
11Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars51.74194.177216838.9509
12Providing and fixing steel glazed doors, windows and ventilator of standard Rolled steel sections without horizontal glazing bars, joints mitred and welded with 16X3.15mm lugs 10cm long, embedded in cement concrete block 1:3:6 cement concrete with 20mm gr-Steel doors, windows side hung & ventilator top/ central hung.1604.116.826948.88
13Providing and fixing steel glazed doors, windows and ventilator of standard Rolled steel sections without horizontal glazing bars, joints mitred and welded with 16X3.15mm lugs 10cm long, embedded in cement concrete block 1:3:6 cement concrete with 20mm gr-Steel doors, windows & ventilator fixed1150.86.757767.9
14Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at required spacing and frame around, round or square bars with round headed bolts and nuts or by screws.222.488.419660.16
1510mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)96.2315.0830310.696
1615mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)125.3315.0839479.524
17Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.217.69.091977.984
18Extra for providing and fixing glass strips in joints of floors-40 mm wide 4 mm thick.252005000
19White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.944.127.1225603.992
20Kota stone slab flooring over 20mm thick base of C.M. 1:6 laid over and jointed with grey cement slurry mixed with pigment to match the shade of slab including grinding, rubbing & polishing etc. complete. (Area of each stone should not be less than 0.20 S-30 mm thick .1261.9143.44181006.936
21Cement washing (Portland cement) 2 coats.-White cement16.6692.9811503.468
22Snowcem or durocem painting of any shade-2 coats on new work20.3315.086396.124
23Oil bound distemper of approved quality of any shade two coats on new works including priming coat.76.1377.928758.19
24Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-2 coats84.9125.28610636.7814
25Stacking of cement bags63120075600
26Transporation of cement concrete pole including loading and unloading upto 40 km. from block head quarter.1276000276000
Total Activity 1448000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)30029588500
2Contengance charges11170011700
3Kota Tiles40150060000
4sand (t)40180072000
5Work Charges1868800868800
Total Material 1101000