S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for item no.0402 | 86.35 | 39 | 3367.65 |
2 | Labour only for item no. 0408 (for any proportion of lime mortar used) | 18 | 750 | 13500 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 11.15 | 3908.6 | 43580.89 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 163.19 | 167.5 | 27334.325 |
5 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 51.94 | 61.4 | 3189.116 |
6 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 350.16 | 66.4 | 23250.624 |
7 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 85516 | 0.2 | 17103.2 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 5582.9 | 10 | 55829 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 160 | 799 | 127840 |
10 | work charge | 20 | 1000 | 20000 |