S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 390 | 7.60930769230769 | 2967.63 |
2 | Providing stone chips under stone pitching | 104 | 612.63625 | 63714.17 |
3 | (a) Other then black trap Basalt or granite | 194.08 | 367.08615004122 | 71244.08 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 683.45 | 2.73487453361621 | 1869.15 |
5 | (I) 0.5 Km. Lead | 194.08 | 145.179977328937 | 28176.53 |
6 | (III) 1.5 Km. Lead | 294.49 | 110.846242656796 | 32643.11 |
7 | (VIII) 4.0 Km. Lead | 388.96 | 152.598596256684 | 59354.75 |
8 | (a) Boulders | 36 | 927.348611111111 | 33384.55 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 85.05 | 490.630570252792 | 41728.13 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 683.45 | 23.1489648108859 | 15821.16 |
11 | b (iii) Dense or hard soil for Tank Work | 233.065 | 156.081264883187 | 36377.08 |
12 | c (iii) Hard moorum for Tank Work | 410.56 | 207.900209469992 | 85355.51 |
13 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 42.225 | 659.777619893428 | 27859.11 |