The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:33:41 AM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/WC/81605 (कपिलधारा कूपनिर्माण मून्‍नलाल देवजीया)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 21/2/2012 Work start date : 22/2/2012
Present status : Existing Proposed Status : Mini Percolation tank
Tech Sanction Details
Technical Sanction No. : 3926(2012) Sanction Date : 21/2/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
91800 61200 0 0 0 0 0 61200 0 153000
Financial Sanction Details
Financial\Administrative Sanction No: 021(2012) Financial\Administrative Sanction Date 22/2/2012
Fin. Sanc. Amt. (in Rs) NREGA:153000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
153000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.54432322
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.2632503.8658.4994
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.3421805.52422.981
5Brick bat filling in trenches or soak pits.92482232
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)13.9622093.429228.0508
715mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)43.2672.13119.046
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work000
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work51.391005139
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work98.91326.2332267.4093
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work137.34515.4970797.3966
12contingency131283128
Total Activity 153000
S.NoMaterialQuantityUnit PriceTotal
1Cement8030024000
2contergency11000010000
3Convergence Amount1500500
4Display board110001000
5IRON SARIYA3380011400
6Sand (Filling)420008000
7गिटटी 20 एम एम97006300
Total Material 61200