The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:33:31 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: LALGAON
Work Code: 1713004009/RC/22012034337283 (सुदूर ग्राम संपर्क सडक शिवराम कोल के घर से ब्रदधा आश्रम तरफ 500 मी )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2017 Work start date : 8/5/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 55/09/02 Sanction Date : 19/4/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
200000 359000 0 0 0 0 0 359000 0 559000
Financial Sanction Details
Financial\Administrative Sanction No: 4009/55/02 Financial\Administrative Sanction Date 4/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:559000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
559000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises10241.71740.8
2Dag-beling-Single spade stroke minimum 75mm deep4800.3144
3Transportation of metal 1001.148112.41112539.04668
4Transportation of metal 387.16412.02159517.6632
5Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia25964.424110
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making294.1721.66354.072
7Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1384.1042331834.392
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work1226.29687.3107055.6408
9Collection of puddle earth including stacking at quarry413.148121.350114.8524
10Collection of hard moorum including stacking at quarry.340.16140.747860.512
11SIGN BOARD1934934
12Labour difference in case of old SoR10015915900
Total Activity 559000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work294.1716.94971.473
2Compaction of Selected soil292.5219.65733.392
3contigency11710017100
4GITTI13500035000
5hume pipe6964.45786.4
6Moorum11600016000
7Transportanion of hard Muram74.16369.6327411.7608
8Transportation Of Earth Work513.14870.0235930.62296
9Transportation of GSB12500025000
10Transportation Of Selected Soi1125000125000
11WATER TENKAR11000010000
12बोर्ड159345934
13रोलर14500045000
Total Material 359000