State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SIGON
Work Code: 1711003050/RC/22012034200047 (PULIYA NIRMAN MUKTI DHAM KE PASS)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2013 Work start date : 21/1/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 1162/1162 Sanction Date : 15/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
112000 120000 0 0 0 0 0 120000 0 232000
Financial Sanction Details
Financial\Administrative Sanction No: 171/171 Financial\Administrative Sanction Date 17/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:232000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
232000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)1.523089.94696.648
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.962404.17116.136
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used1.52169.4257.488
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)3.523375.411881.408
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:4 (1cement, 4sand)36.92280.884161.52
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars69.88154.43801.5264
7TRANSPORTATION OF MATERIAL1116434116434
8Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm)35.93101.63650.488
Total Activity 232000
S.NoMaterialQuantityUnit PriceTotal
140 mm Metal2.710002700
2CEMENT(BEGS)8630025800
3contengency150005000
4steel purches(8mm 10mm 12mm)282.8654.415387.584
5STONE36.7565023887.5
6Transportanion of hard Muram60138.428305.2
7Transportation charges12401924019
8गिटटी 20 mm4.5912005508
9रेत9.347877350.58
10साईनबोर्ड 120002000
Total Material 120000