State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: KHEDINEEMA
Work Code: 1743002057/RC/22012034203823 (Bhamori me ramniwas k ghar se age ki or 150 mCC ro)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 15/2/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 886 Sanction Date : 17/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
94000 62000 0 0 0 0 0 62000 0 156000
Financial Sanction Details
Financial\Administrative Sanction No: 118/13-14 Financial\Administrative Sanction Date 20/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:156000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
156000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep4500.5225
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.45.9464.421315.96
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)45.62507.3114332.88
4False work for R.C.C. and P.C.C. work in plinth and foundation82.8112.39298.44
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2286.21413.6
6Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work45.981.23727.08
7contingency15687.045687.04
Total Activity 156000
S.NoMaterialQuantityUnit PriceTotal
1Cement206.6630061998
Total Material 62000