S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional lift of 1.5 m or part there of-Disintegrated/ soft or hard rock | 3105.8 | 10.7 | 33232.06 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 141 | 260.4 | 36716.4 |
3 | Surface dressing two coats with paving bitumen using 18kg. of bitumen 80/100 per 10sqm with 0.15cum of stone chipping 13.2mm nominal size per 10sqm for 1st coat and 11kg. of bitumen 80/100 per 10sqm with 0.10cum of stone chipping 11.2mm nominal size per 1 | 65 | 174 | 11310 |
4 | Lossening of hard soil by ploughing the existing gound | 6633.66 | 2.7 | 17910.882 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 6633.66 | 50 | 331683 |
6 | work charge | 1 | 17000 | 17000 |