S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 4000 | 4000 |
2 | Contingency | 1 | 52799 | 52799 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 4000 | 0.5 | 2000 |
4 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 5160 | 149.67 | 772297.2 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 640 | 180.63 | 115603.2 |
6 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 5160 | 44.1 | 227556 |
7 | Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural | 900 | 390 | 351000 |
8 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 3320 | 31.7 | 105244 |
9 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 5160 | 33.1 | 170796 |
10 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 640 | 47.9 | 30656 |
11 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to Table 2.2 of IRC:SP:77-2008, having Liquid Limit less than 25 and Plasticity inde | 300 | 593.5 | 178050 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 20000 | 1.8 | 36000 |
13 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 3320 | 87.3 | 289836 |
14 | Collection of soft moorum including stacking at quarry. | 5160 | 121.3 | 625908 |