State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PURABANWAR(P)
Work Code: 1703004045/DP/9993629088 (salpranvangram purabanbar)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2015 Work start date : 21/8/2015
Present status : Existing Proposed Status : Plantation
Tech Sanction Details
Technical Sanction No. : 045/55 Sanction Date : 17/7/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1679390 968871 0 0 0 0 0 969000 0 2648261
Financial Sanction Details
Financial\Administrative Sanction No: 045/822 Financial\Administrative Sanction Date 30/7/2015
Fin. Sanc. Amt. (in Rs) NREGA:2648260 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
2649000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum1166.495110808
2Dag-beling-Single spade stroke minimum 75mm deep243700.37311
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.0.99156.3154.737
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)3.682098.87723.584
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal)0.661869.91234.134
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)1.323280.14329.732
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift13.2181.42394.48
8Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)5.511721.59485.465
9Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)12.312819.834711.738
10Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)0.81752720.82224.254
11Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.32857.618892.8
12Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars82.8956.64691.574
1315mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)104.149.4978.916
14Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-50 mm thick.27.6213.65895.36
15Colour washing 2 coats over and including a primary coat of white washing on undecorated wall surface.64.910.2661.98
16Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats3.2440.3130.572
17Transportation rates for Masonry stone.5.51273.731508.2523
18Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.13.137145.321909.06884
19Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.9.57310.352970.0495
20Providing and fixing to wall ceiling and floor galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings and clamps including walling making good the wall, ceiling and floor-15 mm dia.1278.61092.2
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil11.34951077.3
22Transportion of metal175990.375990.3
23Soil working with formation of half moon circles2920159464280
24Cement concrete Fancing Pole of 1.8 Meter length as per MPLUN specfication.30021063000
25Transporation of cement concrete pole including loading and unloading upto 40 km. from block head quarter.3005.751725
26Barbed wire of 12 gauge as per MPLUN/ MPAGRO specification.45080.2336103.5
27Digging of pits.for fencing pole and fitting work 0.30X0.30X0.45=0.0405 per pole268102680
28Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete.48001048000
29All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants.2920159464280
30All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants.2190159348210
31All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for fourth year per 1350 plants.1460159232140
32All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for fifth year per 2300 plants.730159116070
33Supply of farm yard mannure (FYM) to the plantation site.48007.536000
34Transportation of fertile soil with in 5 km range from plantation site for filling in diging pits quantity will we 1/4 of pit size each pit.48005.8928272
35Supply of vermi compost4800524000
36Supply of singal super phosphate (SSP)120067200
37Supply of muriate of potash (MOP)60063600
38Supply of urea.60063600
39Supply of Neem cake9602019200
40Supply of Themate, phorate 10 G pesticites12010012000
41Supply of foresty or horticulture Plant cost graffted 2 to 3 feet . height72042880
42Supply of foresty or horticulture Plant cost 3 to5 feet . height576030172800
43Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant.48002.512000
44Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day.701500105000
45Consumption of Diesel or monthly electic bill for Irrgation of plantation area per hect.64150096000
46Supply of Pvc pipe line 63mmX4kg/cm24504821600
47Supply of HDP legam pipe 1 Inch500157500
48Supply of farm yard mannure (FYM) and fartilizer second year per plant4800524000
Total Activity 2649000
S.NoMaterialQuantityUnit PriceTotal
110 mm steel 1082554510
220 M.M. METAL2.310002300
340 M.M. METAL65503300
4BAMBOO401004000
5BARBED WIRE 145080.2336103.5
6BINDING WIRE 7820701400
7Cement7027018900
8contigency152040.537452040.5374
9Diesel Pump2092.157.36120002.856
10Display board140004000
11Fartilizer (Gobar Khad)54007.540500
12Fartilizer (Potash)6.75178012015
13Fertilizer5400527000
14First Aid Box1500500
15IRON GATE 232856.9518679.6
16Neem Khali10802021600
17P V C PIPE 24504821600
18PASTTICIED & COMPSED10802.52700
19photocopy page........150011500
20Photograph50301500
21Plant (2)72064320
22PLANT.576033190080
23R.R. stone (granite)5.510505775
24RCC Pole28821060480
25SAND.10.92100010920
26SPRINKLE PIPE5161.2946.57499.985
27STATIONARY......114961496
28Temporary shed150005000
29TRAINSPORT CHARGE5.184340.41764.6336
30Transportation charges400450180000
31Transportation Of Material13472.883472.88
32Urea15.53004650
33उपजाऊ मि‍टटी परि‍वहन30550.216506
34पौधा परि‍वहन 6480638880
35फोरेट135597965
36वर्मी कम्‍पोस्‍ट5400527000
37सिंगल सुपर फास्‍फेट13506.68910
Total Material 969000