State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: MAUCHH(P)
Work Code: 1703004062/WC/22012034619007 (CHECK DEM NIRMAD JAGDISH KE KHET KE PASS NIKODI)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 18/5/2020 Work start date : 6/2/2021
Present status : Non-existent Proposed Status : Repair & Maint of Gabion Check Dam for Community
Tech Sanction Details
Technical Sanction No. : @671 Sanction Date : 31/12/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
665000 443000 0 0 71000 0 0 514000 0 1179000
Financial Sanction Details
Financial\Administrative Sanction No: @51 Financial\Administrative Sanction Date 5/2/2021
Fin. Sanc. Amt. (in Rs) NREGA:1108000 Public Contribution
71000
Scheme 2
0
Scheme 3
0
Total
1179000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.25004.411000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil169.04496.216262.0328
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)13.3250433303.2
4Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size.185.2972504463983.688
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift309.33147.845718.974
622cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014487.819896584.4
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1107256.917107256.917
8Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil600052.7316200
9Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-3 (Size ranging from 53 mm to 22.4 mm)178.74496.288690.788
Total Activity 1179000
S.NoMaterialQuantityUnit PriceTotal
1Display board150005000
2Transpotation Charges12100021000
3गि‍टटी 1301500195000
4रेत 65150097500
5सिमेंट650300195000
Total Material 514000