S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Deduct from items 0102 for uprooting not done. | 228.2 | 104.5 | 23846.9 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 60 | 0.3 | 18 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 37.9 | 882 | 33427.8 |
4 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 220.05 | 211.4 | 46518.57 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 32.6 | 147.8 | 4818.28 |
6 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 88.02 | 1079 | 94973.58 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 45235 | 45235 |
8 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 176.86 | 96.2 | 17013.932 |
9 | SIGN BOARD | 1 | 4000 | 4000 |
10 | contingency | 1 | 10347.938 | 10347.938 |