Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 11:37:20 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: UMARDA
Work Code: 1725007077/RC/22012034191710 (पंच परमेश्‍वर सीसी रोड सह नाली निर्माण कार्य १कडवा)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/9/2012 Work start date : 20/9/2012
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 423u Sanction Date : 11/10/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
80000 53000 0 0 224000 0 0 277000 0 357000
Financial Sanction Details
Financial\Administrative Sanction No: 10513 Financial\Administrative Sanction Date 26/10/2012
Fin. Sanc. Amt. (in Rs) NREGA:133000 Panchparmeshwar
224000
Scheme 2
0
Scheme 3
0
Total
357000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil113.5873.48336.772
2Dag-beling-Double spade "v" shaped stroke 100mm deep3930.4157.2
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m000
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)80.093002.1240438.189
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used80.09108.78705.783
6False work for R.C.C. and P.C.C. work in plinth and foundation223.5154.234463.7
7Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)756.1457.5
8Collection of approved soil having CBR not less then 12, including stacking at quarry.84.14107.49036.636
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 84.186.5547.17
10Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 80.0936.52923.285
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.68.0720413886.28
12Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.136.2133.8118224.922
13Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.784.1821.31793.034
14work charge11802918029
Total Activity 357000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL6190054900
2Cement468300140400
3Centering and Shuttering223.5306705
4Display board125002500
5Empty Gunny Bag55042200
6Mason Payment (Semi Skilled)153004500
7mixer machin (perday)1570010500
8PhotoCopy & Stationary1003300
9Photograph540200
10POLYTHENE (CUM)130003000
11SAND3475025500
12TESTING CHARG120002000
13Transportanion of hard Muram84.18102.968667.1728
14Vibrator (Per Day)154006000
15पानी टेकर244009600
Total Material 277000