S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1000 | 1000 |
2 | Contingency | 1 | 10564 | 10564 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 270 | 65 | 17550 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 158.3 | 145.4 | 23016.82 |
5 | Coursed rubble masonry second sort in plinth and foundation.-In Lime mortar 1:3 (1lime putty, 3sand) | 162 | 2127.2 | 344606.4 |
6 | TRANSPORTATION OF MATERIAL | 1 | 83000 | 83000 |