State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: SALAI
Work Code: 1725006043/IF/15 (कपिल धारा कूप निर्माण नरोत्‍तम सुखराम (सालई))
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2009-2010 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 21/9/2009 Work start date : 1/10/2009
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 00272 Sanction Date : 11/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
58200 38800 0 0 0 0 0 38800 0 97000
Financial Sanction Details
Financial\Administrative Sanction No: 0011 Financial\Administrative Sanction Date 1/10/2013
Fin. Sanc. Amt. (in Rs) NREGA:97000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
97000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6952.41188.956
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum22.6968.21547.458
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)56.41169.989588.5718
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)143.3298.942832.37
5Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)0.223164.44632.88
6Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m20.7420.87432.8438
7Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)4.322077.028972.7264
8False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift86.42112.759743.855
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars123.1348.195933.6347
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.10.180.56813.656
11FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 40 mm nominal size6.22252.351569.617
12FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders6.22205.791280.0138
13work charge184008400
Total Activity 97000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL510005000
2605 J Brick Masonry (1.6)000
3Blasting Holas50804000
4Cement(bori)252506250
5Centering and Shuttering64112.757216
6PhotoCopy & Stationary2752550
7Sand220004000
8STEEL89.4648.194311.0774
9Transportation charges of material111
10Transpotation Charges173957395
Total Material 38800