Work Code: 1722011046/DW/312 (सार्व‍जनिक कूप(नाले के पास) माण्‍डवी (3.90))
Work Category: Drinking Water
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 9/1/2013 Work start date : 3/8/2013
Present status : Not Exist Proposed Status : Recharge Pits
Tech Sanction Details
Technical Sanction No. : 0_04 Sanction Date : 1/4/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
234000 156000 0 0 0 0 0 156000 0 390000
Financial Sanction Details
Financial\Administrative Sanction No: 05_Mandvi Financial\Administrative Sanction Date 20/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:390000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
390000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency11108511085
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m47.6232.41542.888
3Labour only for item no.0402000
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)8.361998.716709.132
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)16.112720.743830.477
6False work for R.C.C. and P.C.C. work in plinth and foundation240.56116.227953.072
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars86552.945758.5
8Extra rates for quantities of work executed . in or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)194.99126.97524758.85525
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work19.08108.22064.456
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work48.85117.75749.645
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30)142.45352.5950226.4455
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work265.64603.53160321.7092
Total Activity 390000
S.NoMaterialQuantityUnit PriceTotal
110 M.M. STEEL8654538925
220 M.M. METAL8150012000
3Blasting35010035000
4Cement13829540710
5Centring & Shuttering2416515665
6Display board130003000
7PhotoCopy & Stationary120002000
8Transporation of Sand420008000
Total Material 156000