S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 360 | 6.65 | 2394 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 101.25 | 148.33 | 15018.4125 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 720 | 144.08 | 103737.6 |
4 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 360 | 0.38 | 136.8 |
5 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 20.25 | 1374.65 | 27836.6625 |
6 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 21.4 | 3920.69 | 83902.766 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 72 | 172.01 | 12384.72 |
8 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 183.6 | 2363.84 | 434001.024 |
9 | Extra rate for C.R./ R.R./ U.C.R. stone masonry in super structure above plinth level upto floor two level. | 97.2 | 294.1 | 28586.52 |
10 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 150 | 86.69 | 13003.5 |
11 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 75 | 72.24 | 5418 |
12 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 540 | 109.18 | 58957.2 |
13 | White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter. | 540 | 10.35 | 5589 |
14 | Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats | 4.5 | 109.49 | 492.705 |
15 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 183.6 | 44.16 | 8107.776 |
16 | Transportation of metal | 39 | 321.52 | 12539.28 |
17 | Transportation rates for Masonry stone. | 183.6 | 506.28 | 92953.008 |
18 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 5 | 226.38 | 1131.9 |
19 | SIGN BOARD | 1 | 809.12 | 809.12 |