S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 97.5 | 71.7 | 6990.75 |
2 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum | 292.5 | 80.6 | 23575.5 |
3 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 399 | 82.7 | 32997.3 |
4 | Collection of quarried stone or rubble.-Maximum size 0.014 cum | 319.2 | 120.3 | 38399.76 |
5 | Transportation of metal | 399 | 119.6 | 47720.4 |