State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: JALHARI
Work Code: 1711006039/AV/22012034370884 (shanti dham niraman /jalahri colony/ jalahri)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 12/10/2017 Work start date : 14/12/2017
Present status : NEW Proposed Status : Construction of Crematorium for Community
Tech Sanction Details
Technical Sanction No. : ts-02/39 Sanction Date : 12/12/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
30000 150000 0 0 0 0 0 150000 0 180000
Financial Sanction Details
Financial\Administrative Sanction No: as-02/39 Financial\Administrative Sanction Date 14/12/2017
Fin. Sanc. Amt. (in Rs) NREGA:180000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
180000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency310003000
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil11.23127.71434.071
4Filling foundation and around masonry work with moorum I/c ramming layers and watering.14.11247.93497.869
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.392562.83562.292
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)3.16491615534.56
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)3.172984.59460.865
8Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1204.5471.786365.518
910mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)12.696.21212.12
10Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.51.2800.340975.36
11Cement washing (Portland cement) 3 coats.-White cement10.824.9268.92
12Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats150005000
13Lossening of hard soil by ploughing the existing gound143.752.7388.125
14Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed143.75507187.5
Total Activity 180000
S.NoMaterialQuantityUnit PriceTotal
1Bricks5003.51750
2CEMENT303109300
3Display board120002000
4GITTI 20 MM0.5850425
5GITTI ---40 mm0.5500250
6Iron angles, Trusses, wind tie3504014000
7IRON SARIYA4505826100
8Masonry Stone4152021320
9sand1.610001600
10Senttring101001000
11Tean Shad16240038400
12TRAINSPORT CHARGE13300033000
Total Material 150000