State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: IMALIYA (P)
Work Code: 1734004008/OP/9425893029 (shanti dham nirmad kary golgaon kla)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2017 Work start date : 24/5/2017
Present status : NEW Proposed Status : Crematorium
Tech Sanction Details
Technical Sanction No. : 144088/490889/18/03/ Sanction Date : 18/3/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
36000 144000 0 0 0 0 0 144000 0 180000
Financial Sanction Details
Financial\Administrative Sanction No: 02/144088 Financial\Administrative Sanction Date 25/3/2017
Fin. Sanc. Amt. (in Rs) NREGA:180000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
180000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil11.23127.71434.071
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.14.112247.93498.3648
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.392562.83562.292
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)3.155491615509.98
5Labour only for item no.050242501000
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)3.1682984.59454.896
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1204.5471.786365.518
810mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)12.696.21212.12
9Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.51.2800.340975.36
10Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.6.4528.93384.96
11Cement washing (Portland cement) 3 coats.-Gray cement10.824.9268.92
12Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-1 coats500015000
13Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact000
14Lossening of hard soil by ploughing the existing gound2.7143.75388.125
15Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed50143.757187.5
Total Activity 180000
S.NoMaterialQuantityUnit PriceTotal
1Bricks4000416000
2CEMENT6030018000
3CONTANGANCY11000010000
4GITTI 20 MM610006000
5Iron angles, Trusses, wind tie9041637440
6IRON SARIYA2.5480012000
7Mooram48003200
8Nut Bolt20751500
9sand310003000
10Steel Gate1.8600010800
11teenshed8150012000
12Transportation charges of mate14100014000