S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 5000 | 5000 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 10000 | 4.1 | 41000 |
3 | Contingency | 1 | 53120 | 53120 |
4 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 2000 | 0.5 | 1000 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 1840 | 118.26 | 217598.4 |
6 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 320 | 159.66 | 51091.2 |
7 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 1840 | 41 | 75440 |
8 | Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural | 450 | 334.8 | 150660 |
9 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 2520 | 21.5 | 54180 |
10 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 1840 | 26.2 | 48208 |
11 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 320 | 38.9 | 12448 |
12 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 150 | 441.4 | 66210 |
13 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work | 2520 | 81.2 | 204624 |
14 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 2 | 1135 | 2270 |
15 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 4 | 334 | 1336 |
16 | Collection of soft moorum including stacking at quarry. | 1840 | 112.8 | 207552 |
17 | Collection of hard moorum including stacking at quarry. | 320 | 130.8 | 41856 |