Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:59:20 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BHENGNA(P)
Work Code: 1703004060/RC/22012034212241 (MITTI MURAM ROAD main road se bhegna nale ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 6/3/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 060/3368 Sanction Date : 24/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
724902 509098 0 0 0 0 0 510000 0 1234000
Financial Sanction Details
Financial\Administrative Sanction No: 060/30 Financial\Administrative Sanction Date 25/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1234000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1234000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard150005000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.100004.141000
3Contingency15312053120
4Dag-beling-Double spade "v" shaped stroke 100mm deep20000.51000
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.1840118.26217598.4
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.320159.6651091.2
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.18404175440
8Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural450334.8150660
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making252021.554180
10Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact184026.248208
11Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)32038.912448
12Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:150441.466210
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work252081.2204624
14Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil211352270
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil43341336
16Collection of soft moorum including stacking at quarry.1840112.8207552
17Collection of hard moorum including stacking at quarry.320130.841856
Total Activity 1234000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges160006000
2Gravel or moorum450334.8150660
3km stone66013606
4roler17508075080
5Transportanion of hard Muram320159.6651091.2
6Transportanion of Soft Muram1840118.26217598.4
7बोर्ड150005000
Total Material 510000