Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 07:33:45 AM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: GONDARI-27
Work Code: 1713004023/IF/1000040755 (पशु पालन सेड निर्माण राजकुमार पटेल/बाल्‍मीक पटेल T)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 3/9/2013 Work start date : 28/9/2013
Present status : Existing Proposed Status : Cattle Shed
Tech Sanction Details
Technical Sanction No. : 4023/860 Sanction Date : 8/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
9200 36800 0 0 0 0 0 36800 0 46000
Financial Sanction Details
Financial\Administrative Sanction No: 4023/5 Financial\Administrative Sanction Date 10/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:46000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
46000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3.1393234.310152.4677
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)5.0522343.811840.8776
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)3.222334.47516.768
5Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)2.382334.45555.872
615mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)16.1285.81383.096
7Transportation of metal 6.76288.41949.584
8Transportation of sand4259.561038.24
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.5.66288.41632.344
10Providing and fixing laboratory sink with C.I. or M.S. brackets painted white including cutting holes in walls and making good the same but excluding fitting.-Glazed Earthenware 450 mm x 300 mm x 150 mm size3.590.3316.05
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work16.581.21339.8
12Collection of hard moorum including stacking at quarry.5.76390.362248.4736
13contingency110001000
Total Activity 46000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL1835835
240 M.M. METAL (cum)2.367501770
3Bricks5.36350018760
4Cement362509000
5sand motor1.4120502890.5
6Transpotation Charges135003500
Total Material 36800