State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: GADHOLAKHANDE
Work Code: 1711003048/WC/22012034296379 (तालाब निर्माण कार्य गढोला खाडे)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2016 Work start date : 13/6/2016
Present status : Non-existent Proposed Status : Stop Dam
Tech Sanction Details
Technical Sanction No. : 190/HJU Sanction Date : 7/6/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
729000 242000 0 0 0 0 0 242000 0 971000
Financial Sanction Details
Financial\Administrative Sanction No: 03/JUH Financial\Administrative Sanction Date 10/6/2016
Fin. Sanc. Amt. (in Rs) NREGA:971000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
971000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency1156377156377
3Work charge12577225772
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead1039.0523.924833.295
5TRANSPORTATION OF MATERIAL13090330903
6Labour only for item no.1272220260.657332
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 340.28.82993.76
8Transportation rates for Masonry stone.40.5133.835420.115
9Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.340.2133.8345528.966
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.40.544.71810.35
11FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.202.597.2419691.1
12FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc.340.2165.456269.08
13Site clearance, cutting grass, raking into heaps and removing off the premises18001.83240
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work283.66117.733386.782
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work5179.888.4457894.32
16Collection of puddle earth including stacking at quarry340.2122.841776.56
17Collection of hard moorum including stacking at quarry.40.5142.55771.25
Total Activity 971000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti3.4312004116
240 MM. Gitti6.128004896
3Cement9030027000
4Contengency120002000
5FTSC-Field Technical supervisi11942019420
6Messonary Stone178.27260.646457.162
7PhotoCopy & Stationary120002000
8pitching stone172.14260.644859.684
9SIGNBOARD120002000
10Transportation Of muram56.25133.837527.9375
11Transpotation of Puddle Earth340.2133.8345528.966
12Water Transportation11000010000
13रेत 26.194100026194
Total Material 242000