S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 650 | 4.4 | 2860 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 130 | 0.5 | 65 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal) | 4 | 2202.3 | 8809.2 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:6:12 (1 cement, 6sand, 12metal) | 4.7 | 3183.1 | 14960.57 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 75.7 | 1878 | 142164.6 |
6 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 234 | 127.6 | 29858.4 |
7 | Unloading & stacking of cement from the-Truck, trolly or dumper etc. & stacking in store | 59.1 | 70 | 4137 |
8 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 36.5 | 96.2 | 3511.3 |
9 | SIGN BOARD | 1 | 5000 | 5000 |
10 | contingency | 56927.93 | 1 | 56927.93 |