Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:09:14 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: TINDUWA
Work Code: 1711003045/WC/22012034312556 (GABION STRUCTURE TINDUA NALE PAR PATHARIYA GHAT SE HATHIDOL KI OR)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2015 Work start date : 3/12/2015
Present status : Non-existent Proposed Status : Gabions
Tech Sanction Details
Technical Sanction No. : 447/tin Sanction Date : 30/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
438000 202000 0 0 0 0 0 202000 0 640000
Financial Sanction Details
Financial\Administrative Sanction No: 09/tin Financial\Administrative Sanction Date 2/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:640000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
640000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency15459654596
3Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.944.563.159597.95
4TRANSPORTATION OF MATERIAL1124958124958
5FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.57285.816290.6
6FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders706.8382.8270563.04
7Site clearance, cutting grass, raking into heaps and removing off the premises4801.8864
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work38488.433945.6
9Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.706.8109.277182.56
Total Activity 640000
S.NoMaterialQuantityUnit PriceTotal
1Binding wire944.58075560
2Bolder624.4176.87110437.628
3Display board120002000
4FTSC-Field Technical supervisi11280012800
5PhotoCopy & Stationary110001000
Total Material 202000