S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 14503 | 14503 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 360 | 0.2 | 72 |
4 | TRANSPORTATION OF MATERIAL | 1 | 41181 | 41181 |
5 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 270 | 97.4 | 26298 |
6 | FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc. | 188.1 | 151.9 | 28572.39 |
7 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2400 | 1.6 | 3840 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 3619.5 | 81.2 | 293903.4 |
9 | Collection of puddle earth including stacking at quarry | 188.1 | 112.8 | 21217.68 |
10 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 292.5 | 233.6 | 68328 |