State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: JALHARI
Work Code: 1711006039/LD/22012034938484 (Pashu avrodhak deewal phulan singh ke khet se barelal ke khet ki or jalhari)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 18/8/2023 Work start date : 3/3/2024
Present status : Not Exist Proposed Status : Construction of Stone graded Bund for Community
Tech Sanction Details
Technical Sanction No. : 1711006/2023-2024/28498/TS Sanction Date : 3/3/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
847006.56 435659.7 2072.23 39661.78 0 0 0 478000 0 1324400.27
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2023-2024/28498/AS Financial\Administrative Sanction Date 3/3/2024
Fin. Sanc. Amt. (in Rs) NREGA:1324402 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1325000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.55007.6093163636363641851.24
2(III) Lead upto 200 meters1386126.363376623377175139.64
3(a) C.C. 1:2:4 (1cement, 2sand, 4metal)46.24237.92489177489195792.13
4Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height65107.3190769230776975.74
5(c) Masonry stones, pitching stones or boulders138650.570324675324770090.47
6(XXXI) 70 Km. Lead39.27845.80061115355233214.59
7(II) 1.0 Km. Lead1386130.443823953824180795.14
8(XV) 10 Km. Lead10.164238.3421881149152422.51
9(XXX) 60 Km. Lead19.866682.01147689519813548.84
10Labour only for boulder soling hand packed excluding consolidation.1386215.82772005772299137.22
11(b) Dense or hard soil264169.85306818181844841.21
12Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.1386187.297503607504259594.34
Total Activity 1324000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper4.6210004620
20084-Hire charges of Diesel truck - 9 tonne (without POL)52.316128132100109863.869073
30297-Stone Aggregate(single size): 10 mm nominal size5.0826503303.3
40367-Portland Cement15.246640097574.4
50983-Fine sand (zone IV)20.79102521309.75
61004-Average rate of mild steel round bars for reinforcements0.2504587264001602.935808
71008-Flats up to 10 mm in thickness0.4472477165002907.110115
81215-Welding by electric plant178.899082571178.89908257
91235-Diesel oil384.01830110038401.8301
103-Display Board / CIB110001000
115001-Mobil oil13.54539812703657.257487
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT24.02450012012
13MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)10.1647908029.56
Total Material 305000