S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3858.634 | 3858.634 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 144 | 3.05 | 439.2 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 2461 | 3.05 | 7506.05 |
4 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 40.22 | 169.85 | 6831.367 |
5 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 2461 | 11.36 | 27956.96 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 50.55 | 4408.24 | 222836.532 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 10.8 | 3467.99 | 37454.292 |
8 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 118.66 | 191.2 | 22687.792 |
9 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 145 | 316.79 | 45934.55 |
10 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2461 | 24.66 | 60688.26 |
11 | Transportation rates for Masonry stone. | 31.9 | 187.27 | 5973.913 |
12 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 2461 | 119.29 | 293572.69 |
13 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing. | 2461 | 85.69 | 210883.09 |
14 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 2461 | 20.47 | 50376.67 |