State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: PATNAMANGARH
Work Code: 1711006002/WH/22012034937531 (तालाब जीर्णोद्धार / नवीनीकरण कार्य- कुठारी बारे आम के पास ग्राम तिंदनी, ग्रा.पंचा. पटना मानगढ़ )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 19/5/2023
Present status : Weak Embankment Proposed Status : Renovtion of Community Ponds for Comm
Tech Sanction Details
Technical Sanction No. : 91/EE/2023-24/02 Sanction Date : 27/4/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
399000 598000 0 0 0 0 0 598000 0 997000
Financial Sanction Details
Financial\Administrative Sanction No: 1206/CZP2 Financial\Administrative Sanction Date 5/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:997000 15th Finance Commission
0
Scheme 2
0
Scheme 3
0
Total
997000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard13858.6343858.634
2Site clearance, cutting grass, raking into heaps and removing off the premises1443.05439.2
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil24613.057506.05
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil40.22169.856831.367
5Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil246111.3627956.96
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)50.554408.24222836.532
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)10.83467.9937454.292
8False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift118.66191.222687.792
922cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.145316.7945934.55
10Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 246124.6660688.26
11Transportation rates for Masonry stone.31.9187.275973.913
12Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.2461119.29293572.69
13Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing.246185.69210883.09
14Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making246120.4750376.67
Total Activity 997000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL30200060000
240 M.M. Gitti20190038000
3Cement20340081200
4Centering Shuttring13015019500
5Display board120002000
6Loosening Machine Rent3540.9836073.0510800.00000135
7pitching stone14520029000
8Roller15500075000
9Sand15250037500
10TRAINSPORT CHARGE450500225000
11Transportation charges2050010000
12Water supply (cum)5020010000
Total Material 598000