The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:37:28 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: MANGOLA
Work Code: 1711003017/WC/22012034319760 (NAVEEN TALAB NIRMAN KHASRA No.382 PAR GRAM KABEERPUR)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2017 Work start date : 19/2/2017
Present status : Non-existent Proposed Status : Earthen Dam
Tech Sanction Details
Technical Sanction No. : 1197/wc Sanction Date : 17/2/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
887000 356000 0 0 0 0 0 356000 0 1243000
Financial Sanction Details
Financial\Administrative Sanction No: 18/wc Financial\Administrative Sanction Date 18/2/2017
Fin. Sanc. Amt. (in Rs) NREGA:1243000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1243000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.2062.721.83712.896
3Work charge14201942019
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil6750.8352.7355768.741
5Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil62.7752.73307.979
6Dag-beling-Single spade stroke minimum 75mm deep343.790.3103.137
7Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead1350.16423.932268.9196
8Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m10.3239402.48
9Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.043474.114035.364
10Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)7.112603.518510.885
11Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:5 (1cement, 5sand)61.942343.7145168.778
12TRANSPORTATION OF MATERIAL1134442134442
13Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing45.5589.94094.945
1422cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.0141242.27212.1263485.467
15Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 365.492.2804.078
16Transportation of sand79.77133.8310675.6191
17Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.365.49133.8348913.5267
18Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.79.7744.73565.719
19FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc.626.46165.4103616.484
20Collection of puddle earth including stacking at quarry365.49122.444735.976
21Collection of hard moorum including stacking at quarry.79.77142.511367.225
Total Activity 1243000
S.NoMaterialQuantityUnit PriceTotal
1Cement16130048300
2FTSC-Field Technical supervisi12486024860
3Messonary Stone148.39333.0649422.7734
4PhotoCopy & Stationary118211821
5pitching stone293.54333.0697766.4324
6Soil Transportation365.49133.8348913.5267
7Transportation Of muram75.27214.1116116.0597
8Water Transportation12000020000
9गिटटी 20 एम एम6.512007800
10बोर्ड120002000
11रेत39100039000
Total Material 356000