State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/DP/499 (shanti dham syau)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2011 Work start date : 19/5/2011
Present status : Not Exist Proposed Status : plantation
Tech Sanction Details
Technical Sanction No. : ts 271 Sanction Date : 28/9/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
584412 433588 0 0 0 0 0 434000 0 1018000
Financial Sanction Details
Financial\Administrative Sanction No: as 2443 Financial\Administrative Sanction Date 20/10/2011
Fin. Sanc. Amt. (in Rs) NREGA:1018000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1018000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.31503.410710
2Contingency110805.310805.3
3Dag-beling-Single spade stroke minimum 75mm deep16000.2320
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.33.9809.927455.61
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.581743.22754.256
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)2.231514.43377.112
7Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.270142.938583
8False work for R.C.C. and P.C.C. work in plinth and foundation10.56116.41229.184
9Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.312.9784.7245532.63
10Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)10.541278.313473.282
11Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height638.457.336580.32
12Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Raised and cut pointing109448.653168.4
13Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.19.2621.711936.64
14Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush.14.08226.53189.12
15Transportation of 20 MM metal11.4345.93943.26
16Transportation of sand26.25162.814273.7625
17Transportation rates for Masonry stone.325.54310.1100949.954
18Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.38.66198.37666.278
19Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.376.14147.1555349.001
20Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN240307200
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil2289.8373.8168989.454
22Collection of hard moorum including stacking at quarry.266.34109.329110.962
23TRANSPOTATION OF CEMENT5.1147.15750.465
24All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants.39012247580
25All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants.36012243920
26All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants.36012243920
27Supply of farm yard mannure (FYM) to the plantation site.100101000
28Supply of vermi compost1306780
29Supply of singal super phosphate (SSP)1306.6858
30Supply of muriate of potash (MOP)13017.82314
31Supply of urea.1306780
32Supply of Neem cake3020600
33Supply of graphted foresty or horticulture Plant 1.5 to 2 feet plant height130202600
34Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant.130101300
35Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day.5070035000
Total Activity 1018000
S.NoMaterialQuantityUnit PriceTotal
110 mm steel 1011.41245.914203.26
2AC SHEET 1019.2621.711936.64
3Boulder Transportation325.54310.1100949.954
4Bricks8003.52800
5cement 315026840200
6Contangency14874348743
7IRON GATE 2638.464.741304.48
8photocopy20051000
9Sand26.25762.8120023.7625
10Seedlings / Graft cost130202600
11T&P428.88198.385046.904
12transportation(good soil)8080064000
13Varmi Compost1306780
Total Material 434000