S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Medium shrub jungle (25% to 50% area covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works) | 3 | 5000 | 15000 |
2 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 2505 | 10.7 | 26803.5 |
3 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 40.5 | 260.4 | 10546.2 |
4 | Lossening of hard soil by ploughing the existing gound | 5437 | 2.7 | 14679.9 |
5 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 5437 | 50 | 271850 |