S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 250 | 6.64524 | 1661.31 |
2 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 67.2 | 207.468005952381 | 13941.85 |
3 | (a) Other then black trap Basalt or granite | 88.21 | 301.756943657182 | 26617.98 |
4 | (XI) 6 Km. Lead | 88.21 | 262.241469221177 | 23132.32 |
5 | (XIV) 9 Km. Lead | 390 | 200.121666666667 | 78047.45 |
6 | (XX) 20 Km. Lead | 210 | 289.369904761905 | 60767.68 |
7 | (III) 1.5 Km. Lead | 111.38 | 104.676602621656 | 11658.88 |
8 | (a) Boulders | 157.5 | 576.088126984127 | 90733.88 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 111.38 | 428.449991021727 | 47720.76 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 711.38 | 21.7849250752059 | 15497.36 |
11 | a (iii) Loose or soft soil for Tank Work | 38.75 | 100.962580645161 | 3912.3 |
12 | b (iii) Dense or hard soil for Tank Work | 210 | 136.306238095238 | 28624.31 |
13 | c (iii) Hard moorum for Tank Work | 433.92 | 181.559941924779 | 78782.49 |
14 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 30.38 | 577.324884792627 | 17539.13 |