State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/IF/22012034514658 (PM AWAS WATER HARVESTING AND MEGIC PIT NIRMAN KARYA GAJENDRA / JASVANT SINGH)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2019 Work start date : 25/11/2019
Present status : Not Exist Proposed Status : Construction of Recharge Pits for Individuals
Tech Sanction Details
Technical Sanction No. : 4084/313 Sanction Date : 6/11/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Beneficiary Contribution scheme2 scheme3 Total
1565 3935 0 0 500 0 0 4500 0 6000
Financial Sanction Details
Financial\Administrative Sanction No: 4084/04 Financial\Administrative Sanction Date 19/11/2019
Fin. Sanc. Amt. (in Rs) NREGA:5500 Beneficiary Contribution
500
Scheme 2
0
Scheme 3
0
Total
6000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil3.1776.9243.773
2Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm)0.79160.5126.795
3Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size1.81375678.75
4Transportation of metal 0.79211.2166.848
5contingency11378.081378.08
6Supply of Pvc pipe line 63mmX4kg/cm211.952853405.75
Total Activity 6000
S.NoMaterialQuantityUnit PriceTotal
1boldar1288.15288.15
2Bricks504200
3Cement1300300
4Display board1200200
5Plant540200
6PVC Pipe65003000
7SAND0.180080
8Transpotation Charges0.79211.2166.848
Total Material 4500