State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PURABANWAR(P)
Work Code: 1703004045/DP/22012034238346 (cpw govt primary schcool berni)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 22/2/2017
Present status : Not Exist Proposed Status : Land development
Tech Sanction Details
Technical Sanction No. : 045/4869 Sanction Date : 19/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
328000 121000 0 0 0 0 0 121000 0 449000
Financial Sanction Details
Financial\Administrative Sanction No: 50/45 Financial\Administrative Sanction Date 26/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:449000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
449000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Lime Surkhi Mortar 1:1:1 ( 1 lime putty, 1 surkhi, 1sand )000
2Dag-beling-Single spade stroke minimum 75mm deep100011000
3Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.22.588219845
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)183307.459533.2
5Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.208.51079224971.5
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height10059.15910
7Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing72068.249104
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.23.27200.64667.962
9Transportation rates for Masonry stone.306.18208.563838.53
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.80.22107.38607.606
11Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil112.596.210822.5
Total Activity 449000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL22.5120027000
2CEMENT (BEGS)322909280
3Convergence Amount110001000
4Iron Sheet10059.15910
5Sand3.127352293.2
6Transpotation Charges17549075490
Total Material 121000