S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 0 | 1.6 | 0 |
2 | Work charge | 1 | 16875.01 | 16875.01 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 76.75 | 145.4 | 11159.45 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 62.35 | 3234.3 | 201658.605 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 58 | 2343.8 | 135940.4 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 174 | 126.2 | 21958.8 |
7 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 81 | 6.1 | 494.1 |
8 | Transportation of metal | 1 | 99783.5 | 99783.5 |
9 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 580 | 10.2 | 5916 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 36.25 | 88.3 | 3200.875 |
11 | SIGN BOARD | 1 | 2000 | 2000 |