Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 05:56:20 PM 
Back  
State: MADHYA PRADESH District: REWA Block: MAUGANJ Panchayat: DAGADAUAA NO.2
Work Code: 1713006063/RC/15 ( ग्रेवलरोड निर्माण जयकरण साकेत के घर के पास से मटु)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2012 Work start date : 9/4/2012
Present status : No Road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 0330 Sanction Date : 8/2/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
226000 266000 0 0 0 0 0 266000 0 492000
Financial Sanction Details
Financial\Administrative Sanction No: 03/12 Financial\Administrative Sanction Date 14/2/2012
Fin. Sanc. Amt. (in Rs) NREGA:492000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
492000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep15000.2300
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead523.1354.928719.837
3Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2047.51224570
4Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.510.52208.8106596.576
5Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN303.7564.219500.75
6Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.22.5308069300
7Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1743.7518.832782.5
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work1743.7567.8118226.25
9Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil.45005.826100
10Collection of hard moorum including stacking at quarry.303.75109.333199.875
11SIGN BOARD115001500
12contingency10140014000
13Labour difference in case of old SoR7082416992
Total Activity 492000
S.NoMaterialQuantityUnit PriceTotal
1contigency10140014000
2HumePipes22.53406.9276655.7
3Rolling of Muram303.7564.219500.75
4Rolling of Soil1223.418.822999.92
5sing bord115001500
6Transpotation of Mooram510.52208.8106596.576
7Trasportaion of water2047.51224570
Total Material 266000