S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 360 | 7.60930555555556 | 2739.35 |
2 | Mud Mortar | 90.72 | 439.144731040564 | 39839.21 |
3 | Dense or hard soil | 2025 | 10.6759555555556 | 21618.81 |
4 | (III) Lead upto 200 meters | 216 | 126.36337962963 | 27294.49 |
5 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 13.23 | 3642.99168556311 | 48196.78 |
6 | Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column | 72 | 182.282361111111 | 13124.33 |
7 | Labour only for random/ uncoursed rubble masonry in any. Mortar for item no.0506 excluding labour for preparation of mortar. | 216 | 996.14375 | 215167.05 |
8 | Extra rate for C.R./ R.R./ U.C.R. stone masonry in super structure above plinth level upto floor two level. | 97.2 | 323.65329218107 | 31459.1 |
9 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 150 | 107.319066666667 | 16097.86 |
10 | (a) Flush pointing | 432 | 121.432314814815 | 52458.76 |
11 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 216 | 760.41087962963 | 164248.75 |
12 | (c) Masonry stones, pitching stones or boulders | 216 | 50.5703240740741 | 10923.19 |
13 | (a) Dense or hard soil | 320 | 167.31909375 | 53542.11 |
14 | (b) Dense or hard soil | 129.6 | 169.853086419753 | 22012.96 |